on 2007 Sep 26 9:21 AM
Hi,
In the costing sheet, we've got working the percentage overhead .
But now we want to use Quantity based overhead, I've defined a quantity based overhead like this:
Valid from, valid to.
CO Area
Overhead Area
Amount of overhead -->100
Unit-->Euro
Per--> 1
Unit--> unit
I've change the costing sheet replacing the old Overhead rate (percentage overhead) with the percentage overhead.
The problem is that when after costing run(Ck11n),it is taking material cost from BOM,activities cost from master recipe,but overhead cost is not appearing.
Do I have to change anything more?
King regards
Hi
Incase of Material Overhead system looks for material master --> Costing2 tab where we define material overhead key.
In Config->product cost we assing a overhead key to a overhead group.
In costing sheet row for material overhead - we maintain overhead rate assinged to a Overhaed key.
In CK11N the amount under overhead comes from a Cost Sheet.
To load the values of overhead after Costing Run we have to run T-code CO43, in this overhead are load on the material. In Production order cost of over head is loaded.
Hope your query is answered.
Thanks
Colin Thomas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
nobody knows?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
8 | |
6 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.