Hi,

In the costing sheet, we've got working the percentage overhead .

But now we want to use Quantity based overhead, I've defined a quantity based overhead like this:

Valid from, valid to.

CO Area

Overhead Area

Amount of overhead -->100

Unit-->Euro

Per--> 1

Unit--> unit

I've change the costing sheet replacing the old Overhead rate (percentage overhead) with the percentage overhead.

The problem is that when after costing run(Ck11n),it is taking material cost from BOM,activities cost from master recipe,but overhead cost is not appearing.

Do I have to change anything more?

King regards

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi

Incase of Material Overhead system looks for material master --> Costing2 tab where we define material overhead key.

In Config->product cost we assing a overhead key to a overhead group.

In costing sheet row for material overhead - we maintain overhead rate assinged to a Overhaed key.

In CK11N the amount under overhead comes from a Cost Sheet.

To load the values of overhead after Costing Run we have to run T-code CO43, in this overhead are load on the material. In Production order cost of over head is loaded.

Hope your query is answered.

Thanks

Colin Thomas

Former Member
0 Kudos

Finally it works checking "Material Origin" in Costing1 tab.

Message was edited by:

jefazo81 jefazo81

Former Member
0 Kudos

nobody knows?

Former Member
0 Kudos

are u using the same or different costing sheet? if u are using different costing sheet u should update the costing sheet in process order master data (control tab)

Former Member
0 Kudos

I'm using the same costing sheet....