QM Usage Decision before stock posting

alex_alex85
Participant
0 Kudos
320

Hi,

We have Production with QM. So in general, we have Inspection lots for finished goods. Inspection type for finished good is P04 (Goods receipt inspection from production).

There is a case with the following sequence

1. Inspection lot is created

2. Than usage decision is done

3. Than material was posted on stock. The problem is that it still posted on Quality stock

So questions is:

1. Is it possible to post finished good to Unrestricted stock if Usage Decision was done earlier?

2. Is it possible to restrict doing Usage decision if there is no postings for Inspection lot

Additional information: there is integration with EWM so every postings go through it.

Thanks.

Accepted Solutions (0)

Answers (1)

Answers (1)

matjazmoser
Active Participant
0 Kudos

Greetings,

if you do not want to post to quality inspection stock you can define this in inspection type details in material master data.

Best regards,

MM.

alex_alex85
Participant

Hi Matjaz,

Flag you shows means it always be posted to unrestricted. I do not need this.

I need that it should be posted based on usage decision.

My problem is that if I:

- at first, do positive usage decision (UD), and after that do posting - it goes to Q-stock, despite UD is done. So this is my problem.

- If I do vice versa - at first do postings and after that UD, it works fine.

matjazmoser
Active Participant
0 Kudos

Greetings,

I have replicated your scenario in it really is strange that an already closed inspection lot still holds stock. It's also interesting that such quantities are not shown in QVM2 report.

There is SAP note 331223 available that might be interesting for you.

Best regards,

MM