on 2024 Jan 03 12:29 PM
Hi,
We have Production with QM. So in general, we have Inspection lots for finished goods. Inspection type for finished good is P04 (Goods receipt inspection from production).
There is a case with the following sequence
1. Inspection lot is created
2. Than usage decision is done
3. Than material was posted on stock. The problem is that it still posted on Quality stock
So questions is:
1. Is it possible to post finished good to Unrestricted stock if Usage Decision was done earlier?
2. Is it possible to restrict doing Usage decision if there is no postings for Inspection lot
Additional information: there is integration with EWM so every postings go through it.
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Matjaz,
Flag you shows means it always be posted to unrestricted. I do not need this.
I need that it should be posted based on usage decision.
My problem is that if I:
- at first, do positive usage decision (UD), and after that do posting - it goes to Q-stock, despite UD is done. So this is my problem.
- If I do vice versa - at first do postings and after that UD, it works fine.
Greetings,
I have replicated your scenario in it really is strange that an already closed inspection lot still holds stock. It's also interesting that such quantities are not shown in QVM2 report.
There is SAP note 331223 available that might be interesting for you.
Best regards,
MM
User | Count |
---|---|
107 | |
8 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.