on 2007 Mar 14 4:21 PM
Hi to all
I've got a problem with the inspection lot cancellation functionality.
I've an inspection lot that have the origin 08 (tranfer posting), automatically created by the 322 movment posting.
After this I cancel all the actual quantity using the function 'correct actual quantity' in QA02 transaction, so that the situation is:
lot qty 10
actual qty 0
sample size 0.
Now I'd like to cancel the lot, always from transaction QA02, but i can't select the action because the relative task is not active. (Inspection lot --> Functions --> Cancel lot).
I checked the status, and lot cancellation is one of the possible busines process, even if there is a warning. Could you please help me to find a solution to this situation?
I tried to cancel the material document that has originated the inspection lot, but, because of actual quantity correction, there is no quality stock.
The only way I can follow is to use the QA02, but I need to have the task available.
Thanks for your help
Best regards
Paolo Verderio
Paolo,
It is not possible in the standard SAP R/3 system to cancel inspection
lots if they are stock relevant. This is the reason why menu Inspection lot --> Functions --> Cancel lot is not active in QA02.
You can cancel the lots in 2 steps:
1. make a usage decision
2. cancel the lot(s) in transaction QA12/QA14
Hope this helps
Martina
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
8 | |
6 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.