Progress POC% and planned cost currency

0 Kudos
231

Hi,

Can progress POC% be calculated based on company code currency instead of values in controlling area currency?

Our controlling area currency is USD but we have company codes with different company code currencies. We use Progress analysis to determine the POC% which is then used to calculate revenue when using result analysis.

For a company code with EUR currency, the planning is done in EUR but when calculating POC% system converts the planned costs to USD using exchange rate and then calculates POC%.

We want to see if POC% can be calculated using the values in EUR itself instead of the USD values. This is to avoid exchange rate impact on POC% because the exchange rate type for planning is only maintained once a year and thats used for calculating future planned costs.

Thanks,

Krishna