Production planning with substitute items-not part of BOM

former_member232086
Participant
0 Kudos

Team,

Our production process is complex...to produce one FG we need SFG items in primary and decor (design) level..in decor level also we have different process (2 or 3) which means for one SF we have 3 different sub. codes ..but in FG  BOM we have updated only one SF reference and others are not in BOM...as are doing the planning out side SAP..planners are manually checking the stock and updating the scheduling file.

Now we are planning to run MRP for net requirement calculation..is there any standard function in SAP to solve it,,we need to maintain different SFG codes...can we maintain all the sub. SF codes in FG BOM then how MRP will run???

we cannot maintain alternate BOM ..is there any suggestion other than alternate BOM??

i know there is a function called material substitution ..is there any in ECC like that??

thanks for the help....

Vijesh

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

Hello

You can maintain all the components on the same BOM as alternative items.

Please take a look on the following link for more details about this functionality:

Alternative Items in an Alternative Item Group - BOMs (PP-BD-BOM) - SAP Library

The information below provided on this link explains how can you use this functionality:


You can use alternative items in the following situations:

  • Alternative items with a usage probability

The alternative items are included with a certain usage probability.

    • Material requirements planning (MRP) uses the usage probability to determine dependent requirements for the materials.
    • In the production order, dependent requirements are converted to a reservation.

The withdrawal posting for the reservation in the production order uses either the usage probability or the 100% availability check according to ATP logic.

  • Alternative items for information

You can enter an alternative item for information only. For example, the item is only relevant to missing parts. The usage probability for the item is 0&.

BR

Caetano

former_member232086
Participant
0 Kudos

Thanks Mr.caetano  for the details,

It seems that this is a good option to deal with substitute items in BOM…. Is there any option to get the net requirement though we will keep usage probability is zero. Below is the scenario

  • There are 3 substitute items in BOM- but only for one item, usage probability is determined as 100..but when we run the MRP ,system should consider the existing stock other two items for net requirement calculation and the planned should be based on the items with usage value…the other items are only for net requirement calculation.

Is this possible?

Thanks for the help.

Regards,

Vijesh

former_member232086
Participant
0 Kudos

This message was moderated.

0 Kudos

Hello

On the standard MRP, this is not possible. If you are using the industry solution DIMP, there is a functionality called interchangeability of parts. See the link below for more details:

Interchangeable Manufacturer Parts in MRP - Inventory Management - SAP Library

BR

Caetano