on 2024 Sep 27 11:37 PM
Hello,
I have a First process which manufacture the Tire(Production line-1), once tire is produced then only can make the Car(FG).(Production line -2).
May i know how can i map this process in SAP connecting together?
Thanks,
Shri
Request clarification before answering.
Hello Shri, You use, multiple methods to integrate below process in SAP,
1. BOM will having multiple level like MFG of tire and followed by car assembly, Tyre and Car assembly will be treated as separate Material number.
2. You can use different operation 0010 Tire making , 0020 - Car assembly with same material number.
3. You can also use REM process with Reporting point confirmation.
You can get the lot such resources from google. please explore before raising here.
Regards
Prasath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
39 | |
8 | |
6 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.