cancel
Showing results for 
Search instead for 
Did you mean: 

Price Determination in Material Master from 3 ---> 2

baher155555
Discoverer
0 Kudos

Hello SAP Community,

Customer wants to change a Material (Material type - Spare parts) from S to V, and I know in order to do such thing we need first to change Price Determination from 3 to 2, However, when I try to do that from T.code CKMM, SAP pop up with message "No data base changed" and there is an error log, finally when I check MM02 in order to change the Price Control field The system won't allow me to do so.

Kindly check the attached screen shots.

Accepted Solutions (0)

Answers (0)