Does the preventive maintenance plan strategy hierarchy works same way in both scenarios:
Scenario 1: Strategy plan has only one item and in task list there is used multiple maintenance packages (example: small inspection every 1YEAR and big inspection every 5 YEAR)
Scenario 2: Strategy plan has two maintenance items
ITEM 1: small inspection every 1 YEAR (own task list with 1 year maintenance packet)
ITEM 2: big inspection every 5 YEAR (own task list with 5 year maintenance packet)
Question: Does the higher hierarchy prevent maintenance plan creation (for 1 year) in scenario 2
Request clarification before answering.
Greetings,
it would appear so yes. I have prepared an example of two maintenance plans for with the same maintenance strategy.
Strategy contains two packages:
I have prepared three different tasks lists:
Operations were properly assigned to packages - below example for FIRST task list example.
I prepared a maintenance plan for first scenario - one maintenance item with a task list containing two operations. Scheduling result is visible below.
I prepared a maintenance plan for second scenario - two maintenance items. Each with a different task list. First with one operation assigned to 1Y package and second with one operation assigned to 5Y package.
Scheduling result is visible below.
Best regards, M.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 23 | |
| 13 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.