I have created a PR no. in CJ20N and then RFQ was generated with reference to that PR. Then outline contract was created in reference to RFQ no. Now I have created a purchase document with reference to said contract, but RFQ and contract no. is not shown in ME21N. There is problem in such case that PR is not directly linked to PO and the same is not saved in EKPO table also .

If I manually enter PR no. then it is saved into EKPO table.

I want to know why PR no. is not stored in EKPO table when I have created the same in reference to each other succeeding document, Is there solution in standard that when I create PO with reference to contract then PR should come automatically.

View Entire Topic
umeshjbs
Participant

Enhancement has been made in system by ABAPer , now it is facing all related data.