cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

posting period - M7053

Fabian1963
Discoverer
0 Kudos
175

Hi all,

I have an issue with the posting periods in our test system. 

I uploaded stock with T /SCWM/ISU to EWM and checked the flag to not post stock to ERP. 
This step was successful and I can see the stock in T /SCWM/MON.

Now I want to use T /SCWM/ERP_STOCKCHECK to also post the stock in ERP. 
The system displays the error "M7035 - posting only in periods 2025/03 and 2025/02 in company code XXXX"

In transaction MMRV the current period is 2025/05. 
Yesterday however I moved the posting periods from 2024/08 to 2025/05 using T MMPV. In case this is may be important.

Any help is appreciated!

Thank you in advance,

Fabian

View Entire Topic
RaymondGiuseppi
Active Contributor
0 Kudos

Seems the system didn't allow you to skip so many periods, did you get any error,

  • Look at acua current MM period with MMRV
  • Look at current period status wih MMPV using 'check only' and today date
  • Try to close every period one per one (hoping MMPV skip many periods is not active)
  • Check also if restrictions related to user parameters MMPV_READ_NOTE and MPV_NUMBER_DAYS_ALLOWED (Note 1082841 ) are active
  • In test systems, consider scheduing report RMMMPERI in a periodic job (with dynamic current date in the variant)
Fabian1963
Discoverer
0 Kudos

Hi Raymond,

thank you for the answer!

I did initially close the periods one by one from 2024/08 to 2025/05. 

However it did not change the error message i get from the system.