Hi SAP MM GURUS

creating PO release strategy and on 3 parameters value,Plant,Doc type trying to trigger that but me not getting sucess checked all the things not able to identify where is the mistake plz help need to deliver on time.

created charcterstics-CT04

INPUTS

Value-CEKKO-GNETW-INTERVAL VALUE ALLOWED-MULTIPLE VALUE--- > 1.00 INR NOT READY FOR INPUT-032

Doc type-CEKKOBSARTINTERVAL VALUE ALLOWED-MULTIPLE VALUEmy inputsNOT READY FOR INPUT---032

Plant-CEKKO-WERKSINTERVAL VALUE ALLOWED-MULTIPLE VALUEmy inputsNOT READY FOR INPUT---032

cREATED CLASS -CL02

AND ADDED ALL CHARACTERSTICS IN THAT

AND REST FOLLWED ALL STEPS REQ IN CTREATING STRATEGY

BUT ITS NOT TRIGGERING I AM UNABLE TO IDENTIFY ..PLEASE SUGGEST

WE HAVE PR STARTEGY ALSO

rEGARDS

9391180032

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Atul,

Did you ticked your charaterstic in Release strategy?

Former Member
0 Kudos

Hi experts

still my problem not resolved

as per all your views just for checking purpose i am cecking with value,doc type and po creation date

but still no success

i feel there is some problem with class only do we need to do anything special with class except addinf characterstics

regards

Former Member
0 Kudos

Required your valuable suggestions

former_member226201
Active Contributor
0 Kudos

Hi

as per your answers you did all the settings properly.

kindly check the input date like plant and document type and value in the po and the same character stics assign in release strategy ?

just simulate the release strategy once again.

just referesh data in the po document menas chage some characterstic once aand check.

laxman

murugan_mgl
Active Contributor
0 Kudos

Other way is u create Rel startegy for each plant & one rel strategy wwith plant value blank.

ajitkumar
Active Contributor
0 Kudos

pl check that there are no more than one release strategy for the same set of characterisitc values

jagadeesh_madiwalar
Active Contributor
0 Kudos

Hi

Do assign all the release stratery in CL24N and you will get the tab in PO and do the simulation their you will get confirmation of the release behaviour.( this you can do in SPRO--> Release stratergy )

Former Member
0 Kudos

Hi dear

I had already added that iN Cl24n but not working even in cl20n also added but not working

jagadeesh_madiwalar
Active Contributor
0 Kudos

HI,

Check in CL24N the status should be Released ( Status as 1), even still you anable to trigger the delete all the data and then create or do fresh setting for the release. This will happen with all in some times.

Former Member
0 Kudos

hi checked all the things deleted and recreated the things but still its not triggering

if any body gives there id i can send the sanp shots also

Former Member
0 Kudos

i am asking very silly Question

r we activating in spro po release strategy active

whyy its not triggering

murugan_mgl
Active Contributor
0 Kudos

HI,

How many plants u have in your release startegy?

For example,if u r having 4 plants in CL20N, & in ur PO it is having only 3 plants the release startegy will not trigger.So u remove the plants from CL20n & leave it blank.

former_member680448
Participant
0 Kudos

Hi,

If you need Plant to be aprt of the strategy, there is an user exit which needs to be activated and the value of the plant must be passed, so that the strategy will get trigger. There is always a problem in triggering the strategy, if we incluide the line item level parameters, for ex: plant.

regards

Chaitanya