Hi,
Is it possible to create PO between two storage location through planning run in s4 HANA PPDS? For example- Location A has storage locations 1023. 1024 and 1025 and Location B has storage locations 1051, 1052 and 1053.
I want PPDS to show Preq created between 1024 and 1052. Is it possible? or system will always show Preq between location A and B? Please let me know.
Thanks,