2024 Feb 08 2:40 PM - edited 2024 Feb 08 2:45 PM
Hello all,
I have this requirement:
One Work order opened against multiple equipments and with the possibility to settle each cost to each different cost center (filled in each equipment master data).
I saw that it is possible, for example, to set a different functional location / Equipment to each operation...but How I can make that for each operation, each cost generated will be settled to the related equipment cost center?
I know that in the settlement rule is considered only ONE cost center, from the main FL/equip master data...
Thank you to all
Request clarification before answering.
Hi,
You need to activate Operation Level Costing, then it is possible. Refer below link
Regards
Terence
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
13 | |
11 | |
5 | |
5 | |
5 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.