Plant Maintenance - Create Maintenance Order Costing

0 Kudos
295

I am creating a Maitenance order, and under operating have assigned work and duration and activity type Labor.

When I click on Determine costs, I get an error. "Missing Formula in work center XXXX". I am not sure how to configure the costs in my work center to make this right. I have checked in CR02, but not sure what changes to make there, as I already have entries for Labor using SAP007 formula.

However, if I skip past this and do a confirmation of the order, my actual costs do calculate correctly. What am I missing?

Accepted Solutions (1)

Accepted Solutions (1)

peter_atkin
Active Contributor

Nathan,

Make sure you have assigned a formula on the Capacity and Scheduling tabs in the work centre. The standard values for PM/CS work centres are SAP008 and SAP004 respectively:

[Removed by the moderator.]

0 Kudos

I think this was along the right track...

I did solve it by going to the costing tab for my work center (in cr02), and scrolling about halfway down where there was a field for "Proj Rqmts Netwk/Maint" and setting that to SAP008. After that my costs were determined on the maintenance order. Thanks.