my scenario is MTO with an FG that has an SFG in its BOM. The FG's requirements influence the SFG's planned orders. however, the SFG has a standard lot size of 12,000. i am using lot size EX, and have set min & maximum lot size of 12,000. in OMI4, i also have set option 1 : Lot for Lot rounding.

there is a 1 pc is to 1 pc relationship between FG & SFG. expect in MRP run, system will not generate an extra planned order if FG requirements exceed lot size of SFG. Example, FG order is 12,0001.

SFG planned order should not be 2, only one with qty of 12,000.

However, system generates 2 planned orders, both 12,000. system is creating an extra planned order, to meet the extra 1 pc requirement. can i restrict this?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

HI RAF,

You can avoid this situation by using MRP group and there you can specify a percentage of safety stock that can be used for planning.So now when your system is short of small quantities like 1pc than it will just take it from safety stock and no pld order will be generated for that quantity(1pc).

Regs

Dardo

bear_boy
Participant
0 Kudos

what if i don't maintain safety stocks? is there another way around?