on 2010 Jun 07 11:05 AM
Dear Friends,
I am getting a problem in Change Physical sample(T Code - QPR2) that is Status is coming CRTD. I need it to be REL otherwise at the time of result records I am getting problem. My inspection Plan is assigned with Sample drawing proc. with inspection point (Physical Sample). Please guide me.
Regards,
Neel.
Hi,
Try QPR4 to released physical sample.
Regards
sanil
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
IN QPR2 > Physical Sample ( Top left corner)> Functions --> Release sample --> Save
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
can you not manually release the sample in QPR2.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Yo can change status from QPR2
Release tab is available on screen (green flag top left corner)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
8 | |
6 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.