cancel
Showing results for 
Search instead for 
Did you mean: 

Perfomance Issue on mvmt type 311

daw3n-ong
Discoverer
0 Kudos
189

Hi SAP expert,

Im facing delay on material document to be show up in MSEG table after transfer posting with mvmt type 311.

When posting with same batch number will no have any delay but come to difference batch number will be need to wait for some time after posting and only reflect the material document in MSEG table. PS: the new batch number was created before transfer posting.

Even try with tcode MB1B or MIGO, after POST, material document shown at message bar but immediately go to MSEG table there no reflect on the table.

I have this issue with only 311 mvmt type. Did any expert can share some idea on this? Appreciate if can help.

Thanks.

stanislaslemaire
Participant
0 Kudos

Hello.
The best way is to do an analyse of your transaction by use of SAT transaction. Check result and you would be able to find the issue !

Accepted Solutions (0)

Answers (1)

Answers (1)

BijayKumarBarik
Active Contributor
0 Kudos

311 for Transfer posting storage location (one-step) with plant and after posting document only, if document posted - you can view same in MIGO display document or MB03 with Material Doc. number and Mat. Doc. Year or also an entry in MSEG entry with Material Doc. number and 311 movement type.

daw3n-ong
Discoverer
0 Kudos

Hi Expert,

Thank you for your reply. Yes, im able to view the material document but required some waiting time only able to retrieve the record. So my question is what causing the delay issue in this case? Any idea on this?

BijayKumarBarik
Active Contributor
0 Kudos

Involve technical team why system response slow for you/all based on your system setting.