HI,

there are 2 plants A and B

there is 'X' material which is required in A but produced in B

The capacity of B plant is 1000 tons of 'X, material

If the requirment of 'x' material in A plant is 2000 tons.

System has to genrate 'X'material

1000 tons has stock transfer order from plant B

remaining 1000 tons has Pur.req to procure from outside

Regards,

somiraghu

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

your requirement is not possible with automatic generation.

If you are maintiaing MRP, system creates PR automatically, so with reference this PR make STO and PO manually.