on ‎2020 May 25 1:39 PM
Hi Experts,
We are trying to configure an EDI output for billing type = "F2" and posting status = "C".
We want the EDI to be generated only when the journal entry is created in the system.
Our customer generates the billing document first, and then posted it in a second step (two step procedure):

We have already configured the output type:

...the receiver:

...the channel:


...and add the customer in the communication system:

However, when we post the billing document no EDI is created.
Do yo have information regarding this configuration?
Maybe we are missing some configuration step...
If we try to force the EDI creation manually in VF02, the EDI is being formed:

Thank you very much in advance for your comments,
Best regards,
Jorge.
Request clarification before answering.
Firstly please check if the output item with channel EDI is created for the billing document. You can go to app "Display billing document" to check. If not, the settings in app "Output Parameter Determination" needs to be checked, especially the first 3 determination steps.
Secondly if the output item is generated, you need to check the status of the output. If it's in status Error, check the error log. If it's in status "In preparation", try to resend it.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi nancy.guo !
Thanks for the info.
The output item with channel EDI is not created for the billing document.
If I create the output item manually and then send it, everything works fine.
The problem is that we need to send the output automatically when the billing document is post to accounting (posting status of the billing documento = C).
I will have a look at the first 3 determination steps.
Hi again nancy.guo ,
I have tried the following configuration and now is working OK.
Output Type:
1
=C (Journal entry has been created)
BILLING_DOCUMENT (Billing Document)
1(Immediately)
2
BILLING_DOCUMENT (Billing Document)
1 (Immediately)
Receiver:
1
=BILLING_DOCUMENT (Billing Document)
RE
- (false)
Channel:
1
=BILLING_DOCUMENT (Billing Document)
=F2 (Invoice)
EDI (EDI)
- (false)
2
=BILLING_DOCUMENT (Billing Document)
=S2 (Credit Memo Cancellation)
EDI (EDI)
- (false)
3
=BILLING_DOCUMENT (Billing Document)
=G2 (Credit Memo)
EDI (EDI)
- (false)
4
=BILLING_DOCUMENT (Billing Document)
=S1 (Invoice Cancellation)
EDI (EDI)
- (false)
The output item with channel EDI is set to completed only when the jounral entry is created (posting status = C).
Thank you very much!
Best regards,
Jorge.
| User | Count |
|---|---|
| 40 | |
| 21 | |
| 16 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.