on 09-21-2011 1:40 PM
Hi,
Is it possible to have preventive maintenance order release on maintenance plan level instead of order type level?
Br,
Shrithar
EHP 4 got this functionality enabled.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In the link given, all the required pre-requisites have been given. Please check those.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In ECC 6.0 EHP 4 version, you have the option the setting release based on Maintenance plan.
http://help.sap.com/ERP2005_EHP_04/helpdata/EN/86/429EA7A6E945E18A09EE75D566E789/frameset.htm
From above link:
Maintenance plan not immediately released
You can set an indicator in the maintenance plan item to define that any orders created from the maintenance plan during scheduling are not released immediately. This overrides the "Set released status immediately" indicator in Customizing for the order type, if this indicator is set in Customizing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 2 | |
| 2 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.