on 2019 Apr 11 6:52 AM
Hi
We want open a future MM period (05/2019) now in the test system for a testing.
I tried in MMPV with 05/2019 but the system is not allowing.
How can I open a future MM period ?
Thanks.
Request clarification before answering.
Hi Nikki,
By standard, system prevent you shifting to a future period by mistake and only allow you to open it within 10 days against calendar date. If you would like to open MMPV earlier check this note 1082841
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.