OKTZ - cost component structure assignment to plant

juej
Discoverer
0 Kudos
80

Hello All,

I am trying to assign different cost component structure to different plan in a company code. But the system automatically replace the plant with "++++" masked plant . Is it possible to choose palnt in organisation assignement ?

Accepted Solutions (0)

Answers (1)

Answers (1)

juej
Discoverer
0 Kudos

Organizational Levels of Cost Components

The costing type determines the level on which you can define the cost component structure.

  • For a standard cost estimate, the cost component structure must be selected through the company code. This ensures that the same cost component structure is used for all plants and costing variants in the company code. If you use different cost component structures in different plants, the standard cost estimate in one plant cannot access the results of standard cost estimates in other plants to transfer costing data for materials transferred from one plant to another.
  • For modified standard cost estimates, current cost estimates, inventory cost estimates, and sales order cost estimates, the cost component structure can be selected at the following levels:
    • For each company code
    • For each plant
    • For each costing variant