Hi Gurus..
I have a requirement.
My finished Good is Configurable. (ex. FG1)
bom component of FG1 is SFG1.
bom component of SFG1 is SFG2 which is again configurable.
now my issue is when i am maintaining all the materials as configurable all levels of the BOM is exploding during MRP. and the requirements generating for SFG2 as well..but when i am removing the configurable indicator from SFG1 than the requirements of SFG2 is not generating from MRP (no planned order/purchase requisition)
any idea why the system is behaving in this way ??
we are using S4Hana 1709 On-Premise system.and i am using strategy 25 for FG1.