on 2007 Dec 19 4:59 AM
Dear All,
I have rcvd a product which is having rejection & hence no entry is done inSAP.Kindly guide that as this material is to be sent back to supplier , pl guide what to do for this , is something is to be done regarding invoice of this material .
km
Hi
If there is no material entry in SAP first pass GR for same and then u can reject material by 102 Movement again
Vishal...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
as the material is rejected, i suggest u to go for 122 instead of 102.
102 is cancell GR.
if u do 122 in future u will be in a position to get exactly the status of rejection of that particular mateerial.
usually for 102 there could be many reason, but 122 is exclusivly for rejection or return to vendor.
Hi Km
As told by u material is received in plant w/o any trnx. means there is no stock of that material in system but physicaly material is there.
Then how can u create return PO and send same back to vendor
Generaly we create Return PO when some rejected material is lying in plant and u want to send back same to vendor who has supplied that material
Process of return Po is like
Create PO with material Qty and value mark return indicator in item overview ( next to info record column )
Pass MIGO as regular which will deplit stock from ur plant and MIRO for same PO
system will create credit memo in turn and debit vendor account with PO amount
Vishal...
yes actually our mgmt had given me a process to first do G.R & J1IEX after this user will make a return P.O , it was rel by other user .After this again G.R is to be done by this Return P.O -
So first of all GR was done wrt the P.O & j1IEX done , now here material is in Quality insp.so user has told to quality user that this material is in Qstk , so quality user had told that i m going to reject this material --so he had reject ed the material --after this store user had checked in MMBE the stk for this not available neither in Qstk nor in unrest. after this when G.R is done wrt this rtn p.o by mvmt 161, the error comes that this much qty is deficited, pl tell me after quality reject where is the material it is not visible in MMBE.Pl guide
what to do ?
km
Edited by: km on Dec 21, 2007 10:05 AM
Pl help me out
yes actually our mgmt had given me a process to first do G.R & J1IEX after this user will make a return P.O , it was rel by other user .After this again G.R is to be done by this Return P.O -
So first of all GR was done wrt the P.O & j1IEX done , now here material is in Quality insp.so user has told to quality user that this material is in Qstk , so quality user had told that i m going to reject this material --so he had reject ed the material --after this store user had checked in MMBE the stk for this not available neither in Qstk nor in unrest. after this when G.R is done wrt this rtn p.o by mvmt 161, the error comes that this much qty is deficited, pl tell me after quality reject where is the material it is not visible in MMBE.Pl guide
what to do ?
km
Edited by: km on Dec 21, 2007 10:05 AM
hi KM
First of check whether stock was scraped or rejected in UD decision
If stock is scraped at that time u will not able to see stock of that material
Or When u reject material from QA it will goes to Block stock or special storage location defined by U
Check whether stock is lying in block stock or not and reject same from there
Vishal...
See i m not chit chating with u this is my problem , look i m talking as per my requirements that my senior consultant had given me a process to do G.R wrt a Returned P.O which i had made , so for this my consultant says that the material should be in Unres stock.That is the reason i had wrote that can this 122 be reversed so that the material can be transferred from qlty to unres stk.
km
Edited by: km on Dec 24, 2007 10:09 AM
Edited by: km on Dec 24, 2007 10:10 AM
Hello Vishal,
Pl guide that now i have to prepare an outgoing ex. invoice -- by J1IS so as of now in P.O history six doc are generated with mvmt type 122 aas this mat. was rejected by Q.A & also there is a usual GRN doc no , so as this material will be picked by vendor hence we have to give the ex invoice --pl suggest for creating J1IS which doc will be entered 101 or 122.
km
hi,
it is always better to route all the transaction through SAP only.
if the recd. material is against PO, then u should create the GR by 101/103/105 and for rejection u have to go for 122 mvt.
or
u can think of making the GR for the items which is already there with u.
may b by 501 goods receipt without purchase order.
(open a non valuated material code, or valuated code with separation valuation type)
if some activity has been done for the same item, u can even think of creating the production order for the same, and can think of sales invoice.
other wise u can send directly by 502 back to vendor.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
103 & 104 was one option with u.
Since u have not accepted that material means no entry is made in sap then there is no question of rejection.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi KM
Is there any entry in system regarding entry in company premises of this material.Or is this a old material lying in ur plant without system entry
If this material is w/o any entry in system u can remove directly same
Vishal...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi KM
see there are two way to return the mateiral
1. if you want to enter in the system the material you have to complete the formality of the SAP system like PR-PO-GR- IV parking etc......and simply reject through 122 but all this process is in your current date so the audit purpose it is not true because if you made the gr po after a month you should have the suitable ans for that....
2. you can reject the mateiral though non- returnable gate pass in three copy (one for party, second for gate copy and third for you) if the mateiral will return by the party again then you have to create the returnable gate pass
regds
devesh