on 2008 Dec 11 12:52 PM
Hi,
when i run MRP at plant level ( MD01), there are no results.
whereas when i run MRP at material level ( MD02), it is wokring fine.
Am i missing some thing in material master or config ?
Thanks in advance
Request clarification before answering.
Hi Kasi ,
This is the problem with the config , please check if you have created the planning file and activated the file for the plant which you are running MRP , You can do this via transaction MDAB .
Please get back to me for further clarifications required .
Regards,
Mallikharjun.