on 2025 Feb 01 6:46 AM
Dear All,
I want to run MRP in MD01N with selection of MRP controller
PIR--FG(X)-100 QTY
BOM FG(X)- component a,b,c,d in which 3 components a,b,c are related to same MRP controller(001 Domestic) & 4th component d is related to different MRP controller(002 Imported).If I will input the FG code whose PIR is there & MRP controller (002 imported) the system is giving error for no planning file entries exists. My requirement is to run the MRP as per MRP controller(002 imported) whose level 1 FG demand exists in the system. If I input only MRP controller in selection screen(002 Imported) system will plan all such components which are having this mrp controller(002-imported) whether there FG demand exists or not in the period. And the MRP results of MRP live which one is the report like MD05.
Request clarification before answering.
| User | Count |
|---|---|
| 35 | |
| 18 | |
| 14 | |
| 13 | |
| 9 | |
| 3 | |
| 2 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.