on 2023 Sep 14 11:36 AM
Hi, all!
For the MRP controller XYZ, we want the reception date determined in the system to be always either Tuesday or Wednesday. Therefore, if the system determined a Thursday for example, then it would be changed automatically to the next Tuesday.
The goal is for MRP controllers to not be constantly checking the date of the reception.
I think that the solution is creating a new planning calendar with tcode MD25, and then assign to MRP controller.
I have created the following Planning calendar ABC:
But then, I'm not able to add it to MRP controller with tcode OMD0. So, my first question is, is it possible to assign the planning calendar to a MRP controller?
If yes, I understand that it will be enough to have MARC-DISPO = XYZ populated.
If not, do you have any idea what should I configure? Do I need to assign directly the planning calendar ABC in the field MARC-MRPPP = ABC?
Which fields are involved on this configuration?
Thank you for the help!
Request clarification before answering.
MARC-MRPPP is from the MRP2 view of the material master. You can assign the planning calendar there.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Patricia,
such assignment is not possible in SAP standard.
However you can use BADi MD_CHANGE_CALENDAR to implement own logic in Materials Planning (MRP and LTP).
Best regards,
Ondrej
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Patricia
You cannot assign the planning calendar to the MRP Controller in standard.
Best regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
13 | |
11 | |
5 | |
5 | |
5 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.