Dear Gurus
If I maintain availability check for a material (01-daily requirements)in the Material Master, then how will the MRP run takes place,and when will it run (Specific Timings),and where i can see the results for that, and also what time interval will it run??
Warm Regards
Tej
Request clarification before answering.
Tej,
01, is the availability checking group you are maintaining. It's nothing to do with the automatic MRP run.
You need to conduct the MRP run manually whenevr required.
Also you can have MRP run in the background too at the specific & fixed time in a day, preferably in the late night. It requires ceratin settings.
The checking group deals with the requirement generation & not with auto MRP run.
Please follow the link given,
http://www.saptechies.com/configuring-availability-check/
http://help.sap.com/saphelp_46C/helpdata/EN/cb/7f9b7043b711d189410000e829fbbd/frameset.htm
Hope this helps you.
SmanS
Edited by: SAP PP Consultant on Apr 13, 2009 12:53 PM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MRP run is done in MD02...
The time of MRP run is as per ur wish...
After the MRP run, you will get the MRP resullt... At the bottom of the screen of MRP result you will get the time specifications that the MRP has taken for planning..
YOu can see the results in MD04...
karthick
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
after MRP run u can see results in
MD05 - static list
MD04 - Dynamic list (stock req. list)
Regards
kumar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 24 | |
| 16 | |
| 14 | |
| 4 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.