cancel
Showing results for 
Search instead for 
Did you mean: 

Measurement Points Assigned to Material Master

0 Kudos
567

Hello,

I would like to ask if automatic creation of measurement points is possible for an equipment when a material is assigned.

That is, if it is possible to assign the measuring points to the material, and when creating this equipment with this material,measurement points are automatically created/transfered to it.

Thanks in advance.

View Entire Topic
peter_atkin
Active Contributor
0 Kudos

You can assign measurement points to Task List operations as PRTs - but only if you have activated Inspection Rounds via switch LOG_EAM_CI_4.

PeteA