on 2024 May 16 9:17 AM
Hello,
we shall do a technical migration in the middle of 2024 from old sap version to ECC 6.0.
I have some doubts about material evaluation in the new system after the migration.
Must we run the costing run (CK40N) for all the materials in ECC 6.0 ? What is the impact on the accounting document created ?
I am warried because the material have already been costed in the old sap system.
Thanks in advance for your help