Material Doc based on ship-to-party for RPM (returnable packaging material)

0 Kudos
363

Hello Everyone, I have a requirement to create material document for returnable packaging material (RPM) based on ship-to-party were the sold-to & ship-to parties are different. Currently all the material documents as per standard configuration are based on sold-to-party, But we need the RPM to be based on ship-to-party as the customer (sold-to-party) is not responsible for the RPM where ship-to & sold-to are different. Also the main material (eg. The finished goods to be sold) should be against the sold-to-party.This means for the same material document the primary material should be for sold-to-party and the RPM should be for Ship-to-party and the same should reflect in MB58. Can this be done by standard configurations?

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

you have to work with a partner role SB for special stock, see the process in the docu: https://help.sap.com/doc/saphelp_46c/4.6.C/en-US/dd/560051545a11d1a7020000e829fd11/frameset.htm

0 Kudos

Hello Jürgen, the link is not working. Could you please help with the document. This was very helpful.

jrgen.lins Could you please help.