Dear Experts ,
Order cycle in IDES system I am assigning operation and component ( stock Item )
When i am checking costs , Internal labour cost is coming and Internal Materials / Spares cost not showing in front of that. Whereas material cost is showing without value category description.
In assign cost elements value value category i have already assigned cost element group for Internal Materials / Spares cost.
Kindly guide how to get cost in front of Internal Materials / Spares cost.
Thanks ,
Prashant Meshram
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hi Prashant - Check if the cost element group mentioned in your screen shot is linked to the valuation class on the materials.
T-Codes OBYC might help to validate this. If you have any one working in the FI-MM area they should be able to help you with this set up.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Shreyas ,
Thanks for answered.
Problem has solved now.
Internal material cost are showing after assigning correct cost element in value category.
Prashant Meshram
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
12 | |
9 | |
5 | |
4 | |
4 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.