Good afternoon!

I have a requirement to manually create an Inspection lot with inspection type 03.
In transaction QA01 I have assigned an order number. But than I stumbled across that I am not able to assign a master recipe. Which contain all the nessesary signs. I can only assign a typical inspection plan, but is not relevant for me.

What can I do?

Ksenia, with regards

View Entire Topic
former_member42743
Active Contributor

For manual 03's you should generate the inspection lot directly from the order. Not in QA01.

COR2 -->Process Order-->Function-->Inspection Lot-->Generate

Craig

former_member636397
Participant

Thank You very much!!!