2024 Dec 27 11:48 AM - edited 2024 Dec 27 1:14 PM
hello all
is it possible to transfer material to material (Mvt 309) in the same storage type/bin, without having to choose it in LT06?
if I understand correctly, I do MB1B (where I cannot choose storage type/bin) with quantity and materials, after which I do LT06 in which I create a TO but I must choose the storage type.
last step LT12
I am trying to skip the choosing of the storage type and have the system determine source = destination storage type/bin.
is this possible?
EDIT: I have already set "post to same bin" in customizing movement types but it does not help
Request clarification before answering.
I found a solution: I set in customizing automatic TO creation and accept proposal for Mvt 309 and place in same bin.
that solved it.
closing the thread
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 22 | |
| 13 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.