on 2021 Dec 22 9:24 AM
Hi All,
We have lot of open inspection lots for production order with inspection type 03. We want to do mass UD update for all open inspection lots but while using QA16 system is asking for batch assignment. Is it possible to mass UD without assigning batch to the inspection lot in background. If there is any other tcode or process to do kindly let me know.
Thanks in advance.
Dear Imtiyaz Hasan,
thank you for the details provided.
Dipesh is right, there is no standard tool. However, there is a special development (non-standard way), described in SAP Note:
146945 - Making usage decision for production lots w/o batch.
Have a nice day,
Albert
***
Read and follow the 'SAP Community Rules of Engagement' at
https://www.sap.com/community/about/rules-of-engagement.html
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
9 | |
7 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.