I have created three material BOMs for semi-finished goods (SFG). I need to assign these three alternative SFGs to three different WBS finished goods (FG) materials, each belonging to a different WBS (Work Breakdown Structure) project.
To achieve this, I created three production versions (PVs) for the alternative SFGs. During the production of SFG, there is an option to change the PV.
Suppose I choose PV03 (corresponding to alternative SFG 03) and proceed with production, I am able to execute production and generate stock against WBS element.
But the challenge I face is that when I explode the WBS BOM of the FG material, it does not display the components that are subordinate to SFG 03. I want the complete list of components that were utilized in the production of the WBS BOM.
Request clarification before answering.
User | Count |
---|---|
11 | |
7 | |
7 | |
7 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.