on 2025 May 21 3:41 PM
Hello,
I'm uploading PIRs with Fiori app.
Are 1114 items.
First stesp ( upload file) was done ok, and I see all the items , but when I press "save" a progress bar is showing the progres.. after ( 55%) show this strange error
is there someone that know this error and whe I can see the log to understand what happened ?
Best regards
Gildo
Request clarification before answering.
Hello @egil63
See the note 3285620 - FAQ: App "Maintain PIRs", point 8
The number of the requirements plan starts with letter, "I", "P" or "V". In SAP S/4HANA systems requirement plan number might not start with any of the listed letters. Note 2784646 provides with a sample report, which you can use to migrate already existing requirement plan numbers.
Best regards
Dominik Tylczynski
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
@egil63 The note mentions dumps during PIR saving. Check and analyze dumps in ST22. If you can't resolve the issue based on this analysis, report the problem to SAP support.