Hi PP/MM experts,
I searched the forum but couldn't find an answer for configuration for the following scenario.
Scenario:
Our factory is acting as a subcontractor. We receive inventory classified as non-valuated stock. This inventory (raw material) is owned by the third-party. We then have a production order to turn the raw-material into a finished product which is then picked up by the third-party. As part of the production process a by-product/co-product is produced. This by-product we buy from the third-party. Now the problem is that there is a GR on the by-product from the production order as well as a GR on the PO to buy the byproduct from the third-party. Resulting in double inventory.
Question:
Is there a way to link the PO GR to the existing production order byproduct GR in order not to have double inventory? Or is a different type of configuration using sub-contracting PO's more applicable?
Thank you so much for helping with this scenario.
Request clarification before answering.
| User | Count |
|---|---|
| 33 | |
| 18 | |
| 14 | |
| 13 | |
| 9 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.