on 2022 Feb 21 6:23 PM
Hello,
I have the following business case.
In total there are 20 Kanban cards. Each of them contain 10.000 pieces. As soon as I have 8 kanban empty, i want to trigger the replenishment/production order.
This production order should cover the whole 8 kanban cards. (80.000 pieces)
Can you please let me know how to set the control cycle in order that the production order gets trigger for the complete coverage?
fyi.
I set the control cycle as followed but its not working:
Nr. of kanbans: 20
Maximum empty: 8
Kanban quantity: 10.000 PC
No. load carrier: 1
kindly advise how to set it... thank you!!
Request clarification before answering.
Hi
Please take a look of the below Link, which might be useful Blog for you
https://blogs.sap.com/2018/04/11/kanban-process-in-s4-hana-1709/
Thanks & Regards : Raja
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
39 | |
8 | |
4 | |
3 | |
3 | |
3 | |
3 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.