cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

IW8W for refurbishment order with internal operations

0 Kudos
743

hello all

I have an issue with the GR of my refurbishment PM order.

I created an order with a material being repaired and a different material being returned in stock.

Operations are all internal.

I perform GI of the material to be repaired, confirm the operations but when I try to do IW8W for the repaired material, I get a message "

"Goods movements not executed in correct order"

but in fact I did....can someone help? I searched the forum but I could not find this specific issue.

thank you

Accepted Solutions (1)

Accepted Solutions (1)

0 Kudos

found the reason.

It was an additional plant and the correct customizing was not done yet,

I added Goods movement documentation and change document

Answers (1)

Answers (1)

0 Kudos

hi Pete

here it is.

strangely enough, the refurbished material can be booked in the confirmation with Mvt 262document-flow-refurb.png