is there any config for plant-cost center relationship

Former Member
0 Kudos
6,745

looks like our new cost center is not defaulting on the PO accounting document. Is there someplace I should have set-up a plant/cost center relationship?

Thanks in advance

Satya

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

You should be defaulting it with the cost element (g/l account) in OKB9 based on the account it is posting to in PO.

Assign points if helpful

Former Member
0 Kudos

But this will not solve ur problem of defaulting to ur PO.

Former Member
0 Kudos

If u know which G/L account will be posted to in your PO, then u know the cost element. go to okb9. select option 1 - saying valuation area is mandatory. then select details and for that particular plant and the cost element you have got - can default the plant and cost element to the cost center. option 1 will work only if your valuation area = plant in the MM settings.

Former Member
0 Kudos

Hi Satya,

You cannot directly assign a Cost Center to a Plant. But indirectly yes. A Cost Center is assigned to a Profit Center, a Profit Center is assigned to Material Master and the Material Master to a Plant.

Hope this clarifies.

Regards

Sridhar

Former Member
0 Kudos

No. There is no relationship between Plant/ Cost center. Cost center is an object available under Controlling which is turn is assigned to a company code. There is np way that the cost center can be assigned to a Plant