on 2024 Nov 07 6:31 AM
Is there any way to exclude “M03.2025” from the scope of calculation?
The result I would like is for Available to be -30 PC
03/03/2025 do not want it to be considered
Is there a way to achieve this?
Request clarification before answering.
Hi @SI_y_Ito
As I can see it is an Independent Requirement, You can change it manually in the Fiori App 'Maintain PIRs' using Mass Edit option.
1) Navigate to Maintain PIRs Fiori App
2) Select the material line item for which you want to change the quantity for spectific period(in your case M03.2025) > click on Edit option
3) Click on Mass Maintenance Option at the top right corner > In the popup, select the Planning period that you want to skip (It can only be current or future period) and Input Proposed quantity as '0' > Click on OK and then Save.
In this way, you can change the Independent Requirement Quantity to zero (0) for specific period for multiple materials at a time.
Hope this helps and kindly mark the solution as accepted it if resolves your query.
Thanks,
Prabha A
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 29 | |
| 15 | |
| 15 | |
| 6 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.