cancel
Showing results for 
Search instead for 
Did you mean: 

Is Material Staging AND Withdrawal from Alternate Plant possible

hsinger
Explorer
0 Kudos
149

In consideration of the difference of the Plant assignments in the objects that enable Material Staging (assigned to the producing plant (A), is it possible to enable special procurement "withdrawal from alternate plant" for a component AND use material staging in the component supplying plant (B)?

Accepted Solutions (0)

Answers (0)