on 2016 Feb 03 7:22 AM
Hi,
we need to transfer cost from AUC to AUC which already settled to AUC.
WBS1 AUC1 settled to AUC 200
now we are not able to reverse as some cost has been settled to FA. now we need to transfer these cost of AUC to new AUC which is created for new WBS.
i am not able to transfer this using ABUMN.
if i use KB11N system will transfer cost WBS to WBS so after settlement of new WBS it shows cost in both AUC.
Please let me know if there is any other way to transfer cost of AUC to another AUC which is investment measure.
thanks
Sunil
Request clarification before answering.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You won't be able to use external transactions in case of investment measures. Below are possible options you could try out-
1. If the settlement period is open (acq. old asset), reverse the full and period settlements, post JV/ CO doc. between old and new WBS. Settle new WBS.
2. Create completed asset for the new WBS. Use ABSO (TT 320) and transfer post the values between old and new asset. (No AUC in picture)
3. Post internal doc. with credit old and debit new WBS, settle both respectively. You need to ensure completing retirement cycle of the old assets.
Regards
Hi Vengaiah,
this situation comes when distribution line items crosses 999 so it needs to transfer.
i have tested in Quality system to execute Kb11n. and then settled both WBS. it seems fine but i am worried about line items generated which they are processing using CJIC to settle to FA.
situation: Settled to AUC and need to transfer to new AUC of new WBS.
Steps:
1. transfer using KB11N to new WBS
2. Settlement of both WBS so cost will settle to AUC
3. now line item generated in old WBS/AUC is +100 and then after settlement -100.
now to close WBS is this the right way from FI point of view?
how to cross check this whether this process is correct as per FI standards.
thanks
Sunil
Hi Sunil,
From FI Prespective , What ever cost booked on Auc should be completed settled to Asset after the Project is completed. If this is happening fine then it is ok. And also check from the business if this scenarios affects any of the existing reporting.
I hope this is clear.
Thanking you
Vengaiah Chowdary
User | Count |
---|---|
100 | |
11 | |
10 | |
9 | |
6 | |
4 | |
4 | |
4 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.