Inventory control for waffer/die in substrate fabrication

Former Member
0 Kudos
378

Hello gurus,

Looking for advice for inventory control of substrate fabrication. Fundamentally, how do we configure SAP such that 1 piece of a component (wafer) may yield different QTY's of sub-assemblies (sliced die), and plan MRP at the wafer level?

We use a wafer, say W-1, that may be printed into different size die based on the pattern being dispensed. This affects the yield of the wafer- EX, we can yield 121 of D-1 and 242 of D-2 using 1 piece of W-1 based on the print of the die. My question is, how do we configure SAP to plan to order the correct QTY of W-1 with these requirements? We are not able to use a fractional QTY of the die BOM for the wafer (i.e. a die BOM to consume 1/121 wafer per W-1 die). We have heard of solutions using UoM conversion (where 1 die EA = 1 die Sq Inches, so 121 Sq. Inches = 1 Ea Wafer). I have also heard solutions for alternate BOMs based on lot sizing... could this apply here also?

(1) W-1 -> (121) D-1 -> (121) Assembly-1; Demand for 1,000 Assemlby 1

(1) W-1 -> (242) D-2 -> (242) Assembly-2; Demand for 6,000 Assembly 2

How to get SAP to plan to order ~34 W-1?

Using R/3 release 7.3

Regards,

yaokang
Discoverer
0 Kudos
W-1 1 EA = 121 EA D-1 but sometimes it's not fixed ,how to solve? thant means
View Entire Topic
yaokang
Discoverer
0 Kudos
that mean next time it is 1 EA = 130 EA.