on 2015 May 20 8:55 PM
Hi,
I have one business scenario where business is doing the subcontracting from Plant A. Sub-contract purchase order is being raised from plant A.
If components are not available in Plant A, they are doing the stock transfer from Plant B to deliver directly to Sub-contract vendor in Plant A.
At present they are doing the goods receipt wrt outbound delivery in plant A and further doing the transfer posting to Sub-contractor using MIGO; MVT type 541.
Now business want to post the Goods receipt wrt outbound delivery directly to Vendor stock. Basically they want to avoid additional step of transfer posting (541).
I explored the options and activated the business function LOG_MM_OM_1 (Outsourced manufacturing) and implemented the sap note - 1926655 to enable the SC vendor check box in delivery address tab of STO.
Created the Stock transfer order using ME21N and entered the Sub-contract vendor in delivery address tab and selected the SC vendor Check box. Created the outbound delivery using VL10B and done the PGI (VL02N). It picked the mvt type 641 based of delivery schedule line item category.
Now while posting the Goods receipt with reference to Outbound delivery, I am getting below error -
St.w.Vend.Transfer exceeded by 1 EA : MATXXXX PLTXX O
Message no. M7022
Please let me know, whether any additional configuration is required for this? how to overcome this error.
Thanks, Ranjan
Request clarification before answering.
Hi Ranjan,
Check SAP note 1655047 which actually mentions the same issue and scenario.
Let me know if it resolved the issue.
Regards
Rahul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I went through the sap note and checked all the correction suggested in note. all are in place.
Based on note I analyzed the reason for the error and found MSLB-LBUML filed is not getting updated after PGI. I am unable to understand why its not getting updated. Is there any configuration is missing?
I replicated the same scenario in sand box and after PGI, updated the MSLB-LBUML field in debug mode with PGI qty. and after that I was able to post the GR with 101+O .
Please help me to resolve the issue. I am getting lots of pressure from client to resolve this.
Please help.
Thanks,
Ranjan
Hi,
Please help me to resolve this issue.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ranjan,
Please check if note# 1382994 - Inconsistent analysis tools: Outsourced Manufacturing is relevant for your system.
Br,
Raghu.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 29 | |
| 14 | |
| 14 | |
| 6 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.