on 2020 Aug 28 10:00 AM
I do not want to use inspection plans for insp. lots, so normally I unchecked the checkbox "Insp. with task list" in the material master data - quality management tab of the material. Unforunatelly I have this checkbox checked for one material, and now a inspection lot was created, looking for a inspection plan (task list). Because no Insp. plan is maintained, the insp. lot is in status CRTD CHCR and I cannot do the usage decision.
What is the preferred solution to correct this situation and release the material?
Request clarification before answering.
Hello Abhishek,
I solved the problem by creating an easy inspection plan (without chraracteristics) in QP01 and assigned this i.p. to the inspection lot in QA02. Then I had to calculate the sample size and now I was able to do the usage decision.
Kind Regards
Matthias
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
16 | |
6 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.