on 2020 Aug 28 10:00 AM
I do not want to use inspection plans for insp. lots, so normally I unchecked the checkbox "Insp. with task list" in the material master data - quality management tab of the material. Unforunatelly I have this checkbox checked for one material, and now a inspection lot was created, looking for a inspection plan (task list). Because no Insp. plan is maintained, the insp. lot is in status CRTD CHCR and I cannot do the usage decision.
What is the preferred solution to correct this situation and release the material?
Request clarification before answering.
Hi Matthais,
You cancel the inspection lot by reversing the Goods movement and then untick the flag in the QM setup of the Material Master
Thanks and Regards
Abhishek Parab.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Abhishek,
I solved the problem by creating an easy inspection plan (without chraracteristics) in QP01 and assigned this i.p. to the inspection lot in QA02. Then I had to calculate the sample size and now I was able to do the usage decision.
Kind Regards
Matthias
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
16 | |
9 | |
7 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.