Hi Gurus,
i have a problem with incoming IDOC ORDCHG.
In the actual sales order, the availability determines all the schedule line dates, for example Delivery date = 01.03.2025
In field E1EDP20-EDATU i passed a new date to the sales order (01.04.2025). The IDOC is processed correctly and VBEP-EDATU is changed, but all the other schedule line dates are not updated (TranspPlngDate; Mat.Avail.Date; Loading Date; Goods Issue). They remain with the same value, even if the should be updated based on the new delivery date.
If i perform this change manually it works, but if i performed it via interface, it does not work.
Someone can help me?
Thanks
S.