cancel
Showing results for 
Search instead for 
Did you mean: 

how to use variant IF09 and IF04 together

0 Kudos
213

I'm designing a rate looking for specific month as billing period, (IF04) the month of January, in the same time i want to include any move-in Move- out scenarios using IF09.

How can I make these two variant work together , I mean the order of the rate steps. Thanks

Osman

Accepted Solutions (0)

Answers (0)